1
0
Fork 0
mirror of https://code.forgejo.org/forgejo/runner.git synced 2025-08-06 17:40:58 +00:00
Commit graph

5 commits

Author SHA1 Message Date
Earl Warren
b032f2a540
chore: s|runner.forgejo.org|code.forgejo.org/forgejo/runner| (#747)
So that it can be used as a package. Not useful right away, but a precondition to merge the ACT repository into the runner repository.

Reviewed-on: https://code.forgejo.org/forgejo/runner/pulls/747
Reviewed-by: Michael Kriese <michael.kriese@gmx.de>
Co-authored-by: Earl Warren <contact@earl-warren.org>
Co-committed-by: Earl Warren <contact@earl-warren.org>
2025-07-27 16:26:10 +00:00
Earl Warren
eb1becd4b8
chore: s|gitea.com/gitea/act_runner|runner.forgejo.org| 2025-07-03 19:07:02 +02:00
Earl Warren
44d9d4f453
chore: upgrade to code.forgejo.org/forgejo/actions-proto (#655)
In replacement of code.gitea.io/actions-proto-go

- https://gitea.com/gitea/actions-proto-def and https://gitea.com/gitea/actions-proto-go were merged into https://code.forgejo.org/forgejo/actions-proto to facilitate maintenance
- the generated go code is different because the package name is different
    - f4285dfc28 shows they compare exactly identical before the name change
    - a3c95cb82f is the generated code right after the name change
- the cascading pull request further shows the protocol is compatible by running [end-to-end actions tests](https://code.forgejo.org/forgejo/end-to-end/src/branch/main/actions) that rely on it, using a runner binary built from [this pull request](https://code.forgejo.org/forgejo/end-to-end/actions/runs/3329/jobs/2#jobstep-4-640) `0296d988d65e66b8d8a7951d0d7d7f8c6cf78b44` matches `v0.0.1+576-g0296d98`
    - `time="2025-07-03T12:53:50Z" level=info msg="runner: runner, with version: v0.0.1+576-g0296d98, with labels: [docker], declared successfully" func="[func6]" file="[daemon.go:108]"`

A similar pull request will be sent to Forgejo once this one is merged (less risky environment)

Reviewed-on: https://code.forgejo.org/forgejo/runner/pulls/655
Reviewed-by: Michael Kriese <michael.kriese@gmx.de>
Co-authored-by: Earl Warren <contact@earl-warren.org>
Co-committed-by: Earl Warren <contact@earl-warren.org>
2025-07-03 16:55:53 +00:00
Mike Rochefort
93bced9c7b chore: bump actions-proto-go to v0.4.0
bufbuild/connect-go was archived with maintenance transferred to the
ConnectRPC organization. Gitea's protobuf library for actions now uses
the ConnectRPC dependency as of v0.4.0, removing the need to continue
using the dead package.
2024-07-31 01:20:20 -04:00
Earl Warren
e02e0fc5f5
wait for jobs to complete when stopping the runner
When receiving a signal (INT or TERM) wait for running jobs to
complete instead of terminating them right away.

The new shutdown_timeout configuration setting can be used to force
the termination after a grace delay. If not specified or zero it will
shutdown immediately, for backward compatibility. It will be the case
with existing configuration files or when a configuration file is not
specified.

The config.yml created with the generate-config subcommand will
however default shutdown_timeout to 3h (same as timeout) because it is
likely what a new admin would expect: shutting down waits for jobs to
complete and not abort them.
2024-06-07 12:33:34 +02:00